
| DKV, Deutsche Krankenversicherung AG (Cologne) Order details Scope: Construction of administration building Client: DKV Deutsche Krankenversicherung AG Partner: ARGE Stangl - Wolfferts Construction period: 26 months Order volume: € 21.4 million Wolfferts: € 11.3 million
| Trades Cooling: Installation of cooling systems Ventilation: Installation of ventilation systems Heating: Delivery and assembly of heating system I&C: Implementation of I&C systems Sprinkler and fire prevention systems: Implementation of all fire prevention measures Building technology: Installation of entire building control system
|

| AXA Service AG (Cologne) Order details Scope: Conversion of kitchen, bistro Client: AXA Service AG Construction period: 10 months Order volume: € 1.2 million Location: Cologne
| Trades Cooling: Installation of cooling systems Ventilation: Installation of ventilation systems Heating: Delivery and assembly of a heating system Sanitation: sanitary installations I&C: Implementation of I&C systems
| 
| University Hospital of Cologne “ward block” (Cologne) Order details Scope: Extensive renovation of levels 15 to 17 Client: Medfacilities GmbH Order volume: € 2.4 million Location: Cologne Special features: Building in inventory, the conversion work therefore took place during operation of the hospital. The areas for assembly were very restricted in terms of space, deliveries to individual floors made using an external elevator. The reconfiguration work was carried out using an external housing.
| Trades Cooling: Installation of cooling systems Ventilation: Conversion and new installation of ventilation systems Heating: Delivery and assembly of heating systems Sanitation: Installation of all sanitary systems I&C systems: Installation of I&C systems for optimized regulation of technical equipment Sprinkler and fire protection systems: Installation of all sprinkler and fire protection systems
| 
| Hotel de France (Jersey) Order details Scope: Conversion and renovation Client: Hotel de France (Jersey) Ltd. Order volume: € 2.63 million Location: Cologne
| Trades Cooling: Installation of cooling systems Ventilation: Conversion and new installation of ventilation systems Heating: Delivery and assembly of heating systems Sanitation: Installation of all sanitary systems I&C systems: Installation of I&C systems for optimized regulation of technical equipment Sprinkler and fire protection systems: Installation of all sprinkler and fire protection systems
| 
| Datacenter (Frankfurt am Main) Order details Scope: Heating/ventilation/sanitary and cooling systems for an IT center Client: e-shelter GmbH Munich Order volume: € 3.4 million Location: Mannheim
| Trades Cooling: Installation of cooling systems Ventilation: Conversion and new installation of ventilation systems Heating: Delivery and assembly of heating systems Sanitation: Installation of all sanitary systems I&C systems: Installation of I&C systems for optimized regulation of technical equipment
| 
| DKV, Deutsche Krankenversicherung AG (Berlin) Order details Order details: Scope: Reconstruction, expansion and conversion of building technology Client: MEAG Real Estate Hamburg Order volume: € 9 million Location: Cologne / Berlin Special features: Cooling panels installed during continued operation at the location in Berlin
| Trades Rendering of all technical building equipment services
| 
| Stadthaus am Gürzenich (Cologne) Order details Scope: Construction of office and hotel buildings, wellness center with swimming pool, medical practice, stores, underground garage Client: E & P Bauträger- und Projektentwicklungsgesellschaft mbH Construction period: 17 months Partner: Oertel & Prümm Order volume Total: € 20.6 million Wolfferts: € 16 million Location: Cologne Special features: Swimming pool systems
| Trades Air conditioning: Installation of air-conditioning systems Cooling: Installation of cooling systems Ventilation: Delivery and installation of HVAC systems Total air capacity supply and ventilation: Hotel and stores 315,000 m3/h, Wellness Center 84,800 m3/h, Pressure ventilation elevator shaft 14,500 m3/h, Smoke extraction system for underground garage 65,000 m3/h Heating: Delivery and assembly of heating system Sanitation: Sanitary work Electrical engineering: Rendering of electrical engineering I&C: Delivery and assembly of I&C systems Sprinkler and fire prevention systems: Delivery and installation of complete sprinkler and fire protection systems Central building control system Creation of central building control system Swimming pool systems: Implementation of swimming pool systems for the hotel and wellness center Services Planning and consulting: Planning, consulting and implementation for the hotel kitchen
| 
| E.ON Academy (Dusseldorf) Order details Scope: Construction of office and hotel buildings, wellness center with swimming pool, medical practice, stores, underground garage Client: E & P Bauträger- und Projektentwicklungsgesellschaft mbH Construction period: 17 months Service: Renovation of office and seminar rooms Client: E. ON AG Order volume: € 1.5 million Location: Cologne
| Trades Cooling: Installation of cooling systems Ventilation: Conversion and new installation of ventilation systems Heating: Delivery and assembly of heating systems Sanitation: Installation of all sanitary systems
| 
| Mitte District Office – pool 18 (Berlin) Order details Scope: Modernization of heating, ventilation and I&C systems in 77 public buildings (mostly schools with gym halls) during continued operation of the facilities and in a restricted time frame Systems optimization in the form of performance contracting, guaranteed and achieved a cost reduction of 29 % Maintenance and repair of technical equipment Basic cleaning of general surfaces (approx. 10 % of gross floor space) Client: Mitte District Office, Berlin Duration: 12 years Order volume: € 5,680 million (including maintenance and repair over the entire project duration Location: Berlin / Köln-Braunsfeld Contracting model: Savings contracting
| Trades Heating technology: Modernization of heating systems in 77 public facilities,Installation of 15,000 thermostatic valves and 35 condensing boilers Ventilation systems: Renovation of ventilation systems during uninterrupted running of schools I&C systems: Installation of new DDC technology in 77 properties including start up of building control system Financing: bank / forfaiting model
| 
| District of the Frauenkirche “QF1" (Dresden) Order details Scope: Construction of offices and commercial blocks with hotel, restaurants and apartments in development area Client: QF 1 Operating Company Partner: ARGE HSG Leipzig / Wolfferts Leipzig, / Wolfferts Berlin Output volume € 1.5 million Location: Berlin Special features: New design of the “Neumarkt” (new market area) in Dresden based on the historical model, ARGE as technical general contractor, all building services
| Trades Sanitary technology: Wastewater and rainwater drainage 8,000 m Water supply 10,000 m Furnishings 400 pieces 2 skimming tanks 16 pump stations and waste water pumps 1 booster station Fire protection and sprinkler technology: extinguishing lines 650 m firewater removal devices 64 pieces firewater feed-in devices 9 pieces
|